For DOT I worked as lead engineer on their prototype hydraulic wind turbine. The principle is to change the electric drive train in the turbine for a hydraulic version. The actual electricity generation will be done centralized.
With the team I developed all needed elements to run and control this prototype. Hydraulics, Electronics and Control were all developed and assembled in-house with the help of sub-contractors for specialistic parts.
The project is unfortunately classified, so no more graphic material can be shown here. For more info on what I have done please send a message.
For a glimpse of technology look at this Delta article on control optimization.
March 11, 2016